Stage 01Engineering evidence
Operating configuration & geometry
Representation of the lower platform, stacked upper platform, inclined forks and six transported loads as point masses connected to the structure.
Lower platform calculated and upper platform represented by mass
825 kg total
Critical transport configuration
Technical review points
- Technical objective
- Interfaces
- Acceptance criteria



