← All projectsCalculations & simulation · Project 11

Engine-removal lifting beam — 700 kg SWL, two positions

Verification of an engine-removal lifting beam in two working positions: variable geometry, interfaces, loads, material-specific stresses, displacements and lifting-lug checks.

DisciplineCalculations & simulation · Lifting · Multi-position analysis
Documented scope5 project stages
Stress field in an engine-removal lifting beam
01 — Project journey

From assumptions to substantiated results.

A documented view of assumptions, load cases, models and reviewable calculation results.

Stage 01Engineering evidence

Functional configurations — positions 1 & 2

Both operating positions are modelled separately to assess how arm geometry and load position affect the structure and connections.

Model data700 kgSWL

Engine-removal load

Model data2 positionsConfigurations analysed

Retracted / extended arm

Model data115 kgModel mass

Complete structure

Technical review points
  • Technical objective
  • Interfaces
  • Acceptance criteria
Documented evidence03 technical views
Have a similar challenge?

Let’s study your
industrial project.

Request a quote